|
The Sewer Standpipe Replacement Project consists of the following tasks:
Provide sewage bypass pumping to accommodate a peak measured flow for 6”
sewer main approximately 20 GPM for distances as required for each activity.
Replace 14 existing sewer standpipes with a standard 4 ft. diameter precast concrete
sewer manhole and one additional new sewer manhole, which totals 15
manholes. Connections to existing pipes will be made using same size SDR-35
PVC pipes.
Attachments |